1.5. Differing kinds of monitoring activities are necessary in each period in the lifetime of a radioactive waste disposal facility. This Safety Guide covers monitoring and surveillance in the pre-operational, operational, closure and post-closure periods for specific landfill disposal facilities, near surface disposal facilities, geological disposal facilities and disposal facilities for waste from thorium and uranium mining. The pre-operational, operational and post-closure periods set out in Ref. [2] can be further described as follows:
- The pre-operational period includes concept definition, site evaluation (selection, verification and confirmation), safety assessment and design studies. In the case of waste from mining, the pre-operational period corresponds to preparation for environmental remediation of mining facilities, tailings management facilities, piles of waste rock and clean-up waste of the contaminated sites (remediation of mining waste can be looked upon as disposal of the mining waste). The pre-remediation activities include environmental impact assessment1 of the sites surrounding the mine, selection and design of the remedial actions and implementation of an environmental monitoring programme that comprises monitoring of the impact of the remedial actions at the site and monitoring for any change in the environmental baseline conditions outside the remediation site. The pre-operational period also includes the development of programmes and procedures required in support of the application for a licence for construction and initial operation of a disposal facility. The monitoring and testing programmes that are needed to establish baseline conditions should be put in place during this period.
1) The term ‘environmental impact assessment’ is used here in a broad sense. In some States, the term denotes a specified process covering all potential impacts of the project, with a view to soliciting acceptance of a project from all relevant authorities, and which often involves participation of the public.
- The operational period begins when waste is first received at the facility. From this time, radiation exposures may occur as a result of waste management activities, and these are subject to control in accordance with the requirements for protection and safety. Safety assessments and the safety case for the period of operation are updated as necessary to reflect actual experience and increasing knowledge, gained both on the site and at other facilities, in the State and in other States. In the operational period, construction activities may take place at the same time as waste emplacement in and closure or decommissioning of other parts of the facility. This period may include activities for waste retrieval, if considered necessary, prior to closure, activities following the completion of waste emplacement and final closure, including backfilling and sealing of the facility. Records of the waste inventory should be kept throughout the operational period.
- Many reasons could lead to a decision to close a disposal facility. For example, the capacity of the disposal facility may have been reached; other solutions for disposal may have been found; or a political decision may have been made to close the facility. Irrespective of the rationale behind the decision, except in the case of remediation, a decision to close a disposal facility is also a decision to initiate a period of active institutional control, for a near surface disposal facility, or, for other disposal facilities, the post-closure period. Such a decision is specific to disposal facilities and is of high importance for near surface disposal facilities. Initiation of a period of active institutional control will lead to decisions on further activities following the completion of waste emplacement, namely closure and sealing of the disposal facility. At this time, the duration of this period of active institutional period should be determined in accordance with a ‘de minimis’ approach to the risks incurred by a potential human intruder.
- The post-closure period begins at the time when all the engineered containment and isolation features have been put in place, operational buildings and supporting services have been decommissioned, and the facility is in its final configuration. After its closure, the safety of the disposal facility is provided for by means of passive features inherent in the characteristics of the site and the facility and characteristics of the waste packages. A monitoring and surveillance programme is put in place aimed at confirming that the disposal system is performing as expected. Monitoring may also be carried out to enhance confidence in, and therefore acceptance of, the disposal process. For near surface disposal facilities in particular, institutional controls are put in place to prevent intrusion into the facility. Depending on national legislation, the licence to operate a disposal facility may be terminated after the period of active institutional control when all the necessary technical, legal and financial requirements have been fulfilled.

[1.5] 소개

1.5. 방사성폐기물 처분 시설의 수명 주기에 따라 각기 다른 종류의 모니터링 활동이 필요합니다. 본 안전 지침은 특정 매립지 처분 시설, 천층 및 심층 처분 시설, 토륨 및 우라늄 채광 폐기물 처분 시설에 대한 사전 운영, 운영, 폐쇄 및 폐쇄 후 기간에 해당하는 모니터링 및 감시 지침을 제공합니다. 참고 문헌 [2]에는 사전 운영, 운영 및 폐쇄 후에 대한 관련 지침이 다음과 같이 추가로 명시되어 있습니다:
- 사전 운영 기간에는 개념 정의, 현장 평가(선택, 검증 및 확인), 안전성 평가 및 설계 연구가 진행됩니다. 광산에서 발생하는 폐기물의 경우, 사전 운영 기간은 광업 시설, 부산물 관리 시설, 폐암 더미 및 오염 현장의 정화 폐기물의 환경 정비를 위한 준비에 해당한다(광업 폐기물의 재생은 광업 폐기물의 처리로 간주할 수 있다). 사전 복원 활동에는 광산 주변 부지의 환경 영향 평가1, 복원 조치의 설계 및 선정, 환경 모니터링 프로그램 구현(복원 조치에 대한 모니터링, 복원 부지 외부의 환경 기준 조건 변화 모니터링 포함) 등이 포함됩니다. 또한, 사전 운영 기간에는 처분 시설의 건설 및 초기 운영 허가를 위한 프로그램 및 절차 수립 단계도 포함됩니다. 이 기간 동안 기준 조건을 설정하는데 필요한 모니터링 및 테스트 프로그램을 수행해야 합니다.
1) 여기에서 사용된 ‘환경 영향 평가’라는 용어는 광범위한 의미로 사용될 수 있습니다. 일부 주정부에서 해당 용어는 모든 관련 당국으로부터의 프로젝트 승인 요청을 위한 잠재적 영향을 포괄하는 특정 프로세스를 의미하며, 여기에는 종종 대중의 참여가 요구됩니다
- 운영 기간은 폐기물이 시설에 처음 입고되면서 시작됩니다. 이 기간부터는 폐기물 관리로 인한 방사선 피폭이 발생 될 수 있으며, 이는 방호 및 안전 요구 사항에 따라 관리됩니다. 운영 기간에 대한 안전성 평가 및 사례 연구는 현장 및 기타 시설, 기타 주정부에서 얻은 실제적 경험과 정보를 기반으로 필요에 따라 개정됩니다. 운영 기간 동안의 건설 활동은 폐기물의 저장 및 폐쇄 또는 시설의 다른 부분의 폐로와 함께 동시에 수행될 수 있습니다. 이 기간에는 폐쇄 이전의 폐기물 회수, 시설의 되메움(backfilling) 및 밀폐를 포함하여 폐기물의 배치 및 최종 폐쇄 완료 후 활동이 포함될 수 있습니다. 폐기물에 대한 재고 기록은 운영 기간 동안 보관되어야 합니다
- 여러 이유를 통해 처분 시설을 폐쇄하기로 결정할 수 있습니다. 예를 들어, 처분 시설이 용량 한계에 도달했거나, 처분을 위한 다른 해결책이 제시되었거나, 시설을 폐쇄하라는 정치적 결정이 내려졌을 수 있습니다. 결정 근거와는 관계없이 복원의 경우를 제외하고 처분 시설의 폐쇄 결정은 천층 처분 시설 또는 기타 처분 시설에 대한 제도적 관리가 시작되는 기간입니다. 이러한 결정은 처분 시설에 한정되면 천층 처분 시설에 대해 매우 중요합니다. 제도적 관리가 시작되면 폐기물 배치가 완료된 후의 추가 활동, 즉 처분 시설의 폐쇄 및 밀폐에 대한 결정이 내려질 것입니다. 제도적 관리 기간은 잠재적인 침입자에 의해 발생하는 위험에 대한 ‘최소 허용’ 접근 방식에 따라 결정되어야 합니다.
- 폐쇄 후 기간은 모든 공학적 격납 및 격리 기능이 수행되고, 운영 및 지원 건물이 해체되고, 시설의 최종 배치 시점에 시작됩니다. 폐쇄 후 처분 시설의 안전성은 부지 및 시설의 특성, 폐기물 포장 특성에 내재 된 수동적 기능에 따라 결정됩니다. 처분 시스템이 예상대로 작동하는지 확인하기 위해 모니터링 및 감시 프로그램이 시행됩니다. 또한, 모니터링을 통해 처분 프로세스에 대한 신뢰성을 강화할 수 있습니다. 특히, 천층 처분 시설의 경우 시설로의 침입을 방지하기 위한 제도적 관리가 수행됩니다. 국가 법률에 따라 처분 시설의 운영 허가는 필요한 모든 기술적, 법적 및 재정적 요구 사항이 충족되는 제도적 관리 기간 이후에 종료될 수 있습니다.