[6.48] a

6.48. The assessment time frame is often kept fixed throughout the various iterations of safety assessment. In other cases, however, it may be necessary to revise the assessment time frame between different iterations of safety assessment to reflect new information gathered. For example, it might be considered necessary to extend the time frame to ensure that the maximum or peak dose is covered within the assessment calculations. This could be necessary if new information indicates that the waste would contain greater amounts of long lived radionuclides than previously assumed. Alternatively, it might be considered appropriate to restrict the time frame for quantitative assessments to periods over which the results of safety assessment are meaningful, given the uncertainties. As an alternative to limiting the time frame of the assessment, the emphasis put on quantitative results for the later part of the time frame could be reduced. However, in all such cases, the impacts beyond the period of quantitative assessments should be addressed in an appropriate manner in the safety case.

[6.48] 특정 문제

6.48. 시간체계의 평가는 다양한 안전성 재평가를 통하여 수정된다. 그러나 다른 측면으로, 새롭게 수집된 정보를 반영한 안전성 재평가를 통해 평가 기간을 개정하는 것이 필요하다. 예를 들면, 최대 또는 최고 선량이 평가의 계산에서 포함될 수 있도록 시간체계를 확장하는 것이 필요하다. 폐기물은 이전 가정보다 장반감기 방사성핵종의 양을 포함한다는 새로운 정보가 있다면 평가 시간을 늘리는 것이 필요하다. 반대로, 주어진 불확실성에서 안전성 평가 기간이 의미가 있다고 한다면, 정량적 평가 기간을 줄이는 것도 고려할 수 있다. 평가의 기간을 제한하는 대신 후반부 시간체계에 대한 정량적 결과에 대한 강조가 줄어들 수 있다. 그러나 이러한 사례에서, 정량적 평가의 기간 이후에 미치는 영향은 안전사례 보고서에서 적절한 방법으로 언급되어야 한다.