문서

파일 다운로드
  • 부록3._IAEA_SSG-23.hwp

    500.0 KB

[6.34] a

6.34. The complementary fulfillment of the different safety functions should be evaluated over different time periods. Each safety function should be independent of the others, to the extent possible, to ensure that they are complementary and that barriers are unlikely to fail through a single failure mode. In the safety case, the functions provided by each barrier should be explained and justified and the time periods over which they are expected to perform their various safety functions should be identified, together with alternative or additional safety functions that operate if a barrier does not fully perform (e.g. Fig. 5). Figure 5 illustrates the periods during which the various safety functions are fulfilled for one concept for the disposal of spent fuel and high level waste in ‘Boom clay’11. In this example, the engineered barriers are expected to provide complete containment of the waste throughout the period that the disposal facility experiences elevated temperatures, a period of some thousands of years. Thereafter, the Boom clay is expected to retard the migration of radionuclides. More details on this particular example are provided in Ref. [11].@@11) A moderately swelling clay found in the region of the town of Boom, Belgium

[6.34] 특정 문제

6.34. 다른 안전기능의 보완적인 이행은 서로 다른 기간에 대해 평가되어야 한다. 가능한 범위에서, 각 안전기능을 위한 방벽들은 하나의 고장 모드로서는 실패할 가능성이 없게 서로 독립적이어야 한다. 안전사례에서 각각의 방벽에 의해 제공된 기능은 설명되고 정당화되야 한다. 방벽이 다양한 안전 기능을 수행할 것으로 예상되는 동안 기간은 반드시 확인해야만 한다. 만약 하나의 방벽이 제 기능을 수행하지 못한다면 다른 대체 혹은 추가적인 안전기능이 작동함을 확인해야 한다. (예, 그림5). 그림 5는 다양한 안전기능이 ‘Boom Clay’11 의 사용후 연료 및 고준위 폐기물의 처분의 한 가지 기능을 위해서 수행됨을 보여준다. 예를 들면, 몇 천년간, 즉 처분시설이 온도가 높아지는 기간을 통틀어서 공학적 방벽은 폐기물의 격리를 제공하는 기능을 제공한다. 그러므로 Boom clay는 핵종이동의 지연 기능을 한다. 자세한 내용은 참고문헌 [ONDRAF / NIRAS Rep.No.NIROND 2001-05F (2002)]에 나와 있다. @@11) 적당하게 팽창하는 점토는 벨기에 ‘붐’이라는 지역에서 발견되었다.