문서

파일 다운로드
  • 부록3._IAEA_SSG-23.hwp

    500.0 KB

[4.88] a

4.88. At the earliest stages of the programme to develop a disposal facility, there may be many open questions and uncertainties, and the safety case should include clear plans for dealing with these at future stages (e.g. by site characterization or by optimization of system design) and should set out an approach by which these plans will be achieved. At later stages of the programme, and certainly by the time the safety case is to be presented as part of a licence application, uncertainties and open questions on safety should have been addressed in a manner appropriate for the decision at hand. The manner in which this has been done should be reflected in the safety case. Some uncertainties will inevitably remain (a geological barrier, for example, can never be fully characterized without, in the process, perturbing its favourable characteristics to some extent), but the safety case should indicate the reasons why these uncertainties do not undermine the arguments for the safety of the facility.

[4.88] 안전사례구성요소(안전사례 개요)

4.88. 처분시설을 개발하는 프로그램의 초기 단계에는 많은 질문과 불확실성이 있으며, 안전사례는 미래 단계(예: 부지특성 또는 시스템설계 최적화에 의해)에서 이것을 다루기 위한 명확한 계획을 포함해야 하며, 이 계획이 달성될 수 있는 방법을 설정해야 한다. 프로그램의 나중 단계에서, 확실한 시간에 의해 안전사례는 허가신청의 일부로서 제시되어야 하며, 안전성에 대한 불확실성 및 질문은 가까운 미래시점의 결정을 위해 적절한 방식으로 해결해야 하며, 이에 대한 방식은 안전사례에 반영되어야 한다. 일부 불확실성은 불가피하게 남아 있지만 (예: 천연방벽) 안전사례는 이러한 불확실성이 시설의 안전성 논거를 훼손하지 않는 이유를 제시해야 한다.