[4.71] a

4.71. Alternatives should be identified and described in sufficient detail to provide clear answers to these questions. For example, if alternative design options, such as different barrier types, are being considered, then each alternative option should be described and the potential radiological effects, costs and benefits of each alternative should be determined. The criteria and analysis of the different options should then be fully documented to support the proposed design. Further recommendations on decision making and appraisal of alternative options are provided in paras 6.79?6.89. Records should be made of the design evolution and the basis for design related decisions, and these records should be maintained throughout the evolution of the lifetime of the facility.

[4.71] 안전사례구성요소(안전사례 개요)

4.71. 대안은 명확한 결론을 도출하기 위해 충분히 상세하게 검토 및 기술되어야 한다. 예를 들어, 대안적 설계 옵션으로 다른 종류의 방벽을 고려한다면, 각 옵션의 잠재적 방사선 영향, 비용, 이점 등이 결정되어야 하며, 각 대안 옵션에 대한 상세한 기술이 필요하다. 이후 대안 옵션의 기준 및 분석 내용은 제안된 설계를 뒷받침하기 위해 충분히 문서화되어야 한다. 대안 옵션에 대한 결정 및 평가에 대한 추가 권고 사항은 6.79-6.89항에 자세히 서술되어 있다. 이러한 기록은 설계의 전개(진화)를 기반으로하며, 의사 결정에 필요한 설계가 기반 되어야 하며, 처분 시설의 생애 주기 동안 계속 유지되어야 한다.