문서

파일 다운로드
  • 부록3._IAEA_SSG-23.hwp

    500.0 KB

[4.65] a

4.65. Early iteration in the decision making process should be undertaken with the available data and capacity for conducting assessment. The iteration needs to proceed only until the assessment is judged to be adequate for its purpose. Furthermore, additional information needs to be acquired only to the extent necessary to improve the basis on which the decisions will be made. Some decisions may necessitate iteration in respect of only one specific aspect of the safety case (e.g. the improvement of the data requirements for a specific model). Other decisions may necessitate more iterations, which may involve revisions of several components of the safety case, such as:@@@@- The context for the safety case may be adjusted to, for example, treat uncertainties more realistically or to broaden the range of receptors considered.@@@@- The strategy for safety may be revised.@@@@- New data about the site may become available and/or the design may have been developed further. @@@@- Triggered by such changes or by other factors (e.g. the results of peer reviews), the components of the safety case and supporting assessment may need to be revised and developed further.

[4.65] 안전사례구성요소(안전사례 개요)

4.65. 의사결정 프로세스상의 초기 반복은 가용한 데이터와 평가이행 능력범위 내에서 이행되어야 한다. 반복은 평가가 그 목적에 맞게 이루어졌다고 판단될 때까지만 필요하다. 또한, 추가적 정보는 의사결정에 사용한 근거를 향상시키는 데 필요한 범위를 얻기 위해 필요하다. 일부 의사결정은 안전사례 특정부분에 대해서만 반복이 필요할 수 있다.(예: 특정모델에 데이터 요건의 개선). 다른 의사결정은 아래와 같이 안전사례의 일부 구성요소의 개선을 포함한 더 많은 반복이 필요할 수 있다.;@@@@- 안전사례의 조정, 예로 불확실성을 보다 현실적으로 적용 또는 고려된 피폭집단 범위의 확대@@@@- 안전전략의 개정@@@@- 부지 신규데이터 취득 또는 개선된 설계의 개발@@@@- 상기와 같은 변화 또는 다른 요소(예: 전문가 자문결과)에 의한 반복으로 안전사례의 구성요소와 안전성 평가가 개선 또는 더욱 발전되어질 필요가 있다.