[4.11] a

4.11. When developing the safety case, the needs of the key parties that will review, use and approve the safety case (e.g. government, the regulatory body and interested parties) should be identified and should be well understood; such needs will depend on the local and national situation. The safety case, including supporting safety assessment, is the responsibility of the facility operator, and it will need to be presented in a manner that meets the needs of the different interested parties. As far as possible, prior agreement should be achieved through communication with those parties, on what is to be included, assessed and calculated, as appropriate for each step of facility development and for the relative level of hazard associated with the facility. For example, the expectations of interested parties with regard to presentation and interpretation of the results of safety assessment may increase as licensing decision points are approached.

[4.11] 방사성폐기물 처분 관련 안전사례

4.11. 안전사례를 개발에서 안전사례를 검토하고, 활용하고, 승인할 주요 당사자(예를 들어 정부, 규제기관 및 이해관계자)의 요구는 지역 및 국가의 상황에 따라 달라질 수 있기 때문에 확인되어야 하며, 잘 이해되어야 한다. 안전사례와 이를 뒷받침하는 안전성 평가는 처분시설 운영자의 책임이며, 다른 이해관계자의 요구를 충족시키는 방식으로 제시될 필요가 있을 것이다. 가능한 한, 처분시설 개발의 각 단계 및 처분시설과 관련한 위험의 상대적 수준에 적절하게 무엇이 포함되고, 평가되고, 계산되어야 하는지 사전 동의는 당사자들과의 대화를 통해 이루어져야 한다. 예를 들어 안전성 평가 결과의 설명 및 해석과 관련하여 이해관계자의 기대는 인허가 결정 시점이 다가올 때 증가할 수 있다.