문서

파일 다운로드
  • 부록2._IAEA_SSG-14.hwp

    659.5 KB

[6.58] a

6.58. “The disposal facility has to be closed in accordance with the conditions set for closure by the regulatory body in the facility’s authorization, with particular consideration given to any changes in responsibility that may occur at this stage. Consistent with this, the installation of closure features may be performed in parallel with waste emplacement operations. Backfilling and placement of seals or caps may be delayed for a period after the completion of waste emplacement, for example, to allow for monitoring to assess aspects relating to safety after closure or for reasons relating to public acceptability. If such features are not to be put in place for a period of time after the completion of waste emplacement, then the implications for safety during operation and after closure have to be considered in the safety case” [1].

[6.58] 폐쇄

6.58. “처분시설은 시설 승인 과정에 규제기관이 정한 폐쇄 조건에 부합하도록 폐쇄되어야 하며, 이 단계에서 발생할 수 있는 책임의 변화에 특히 주의를 기울여야 한다. 이와 일관되게 폐쇄 특징(물질)의 설치는 폐기물 정치 작업과 병행하여 수행될 수 있다. 뒤채움재, 밀봉재나 덮개 설치는 폐기물 정치가 완료된 이후에도 일정 기간 동안 지연될 수 있으며, 이는 예를 들어, 폐쇄 후 안전성과 관련한 평가 측면에서의 모니터링이나 대중 수용성과 관련한 사유에 기인한다. 폐기물 정치가 완료된 이후 상당 기간 동안 이러한 폐쇄가 이행되지 않는다면, 운영 및 폐쇄 후 안전성에 미치는 영향이 Safety Case에서 고려되어야 한다” [1].