6.23. The site confirmation stage will generally consist of detailed studies and investigation of the preferred site prior to the start of full scale construction of the disposal facility. Careful comparisons with all relevant criteria should be made to confirm that the disposal system, if constructed and operated as designed, will perform as required.
Upon confirmation of the suitability of the site, a proposal is submitted to the regulatory body with sufficient information to permit decisions to be made regarding approval for construction of the facility. This proposal will include a safety assessment based on the results obtained from the site investigation, characterization and confirmation activities. Site confirmation studies are reviewed by the regulatory body regarding the decision on the suitability of the site following its review of all information. If all necessary requirements are met, approval (in the form a licence, an authorization for construction, or other form of permission) to begin construction of the disposal facility may be issued. Characterization activities are normally expected to continue into the construction and operational phases in order to provide further data and further reduce any residual uncertainties in the safety case.

[6.23] 부지특성평가

6.23. 부지확정 단계는 일반적으로 처분시설의 실제 건설(full scale construction)에 앞서, 선호 부지에 대한 상세 연구 및 조사로 구성될 것이다. 설계대로 처분시스템이 건설·운영되는 경우에 해당 처분시스템에 요구되는 성능이 작동할 것이라는 확신은 모든 관련 기준과의 주의 깊은 비교를 통해 이루어져야 한다. 부지 적합성에 대한 확신을 위해, 처분시설의 건설 승인에 대한 의사결정을 할 수 있도록 충분한 정보를 가진 제안서가 규제기관에 제출된다.
해당 제안서는 부지조사, 부지특성평가 및 부지확정 활동으로부터 얻어진 결과에 근거한 하나의 안전성 평가를 포함할 것이다. 부지확정을 위한 연구는 모든 정보를 검토한 이후 부지 적합성에 대한 결정의 관점에서 규제기관에 의해 검토한다. 필요한 모든 요건이 만족된다면, 처분시설의 건설 승인(허가권, 건설권한 또는 다른 인가의 형태로)이 발급될 수 있다. 특성평가 활동은 추가 데이터를 제공하고 Safety Case에서 남은 불확실성을 보다 감소시키기 위해 건설단계와 운영단계까지 지속될 것으로 일반적으로 기대된다.