문서

파일 다운로드
  • 부록2._IAEA_SSG-14.hwp

    659.5 KB

[5.6] a

5.6. A safety case has to be prepared early in the development of a geological disposal facility to guide activities in research and development, site characterization, design and planning [1]. The safety assessment process should involve calculations to evaluate the robustness of the proposed conceptual model(s) in terms of its potential to meet regulatory requirements and to determine the relevant radionuclides, pathways and release mechanisms for which further knowledge is necessary and on which the focus should be set. Scoping calculations are often based on limited data, for example, from searches of the literature, material specifications, laboratory studies and studies of natural analogues, preliminary site investigations and characterization of the waste. Acquisition of data will continue throughout the step by step process until the disposal facility is permanently closed or the proposed concept is determined to be unacceptable.

[5.6] Safety Case와 안전성 평가의 준비, 승인 및 이용

5.6. Safety Case는 연구개발, 부지특성조사, 설계 및 계획에 관한 활동을 이끌어 낼 수 있도록 심층처분시설 개발 초기에 준비되어야 한다[1]. 안전성 평가 절차는 규제요건을 충족시킨다는 관점에서 제안된 개념 모델의 강건성(robustness)을 평가하기 위한 계산과 함께, 부가적인 정보가 필요하고 이에 초점을 맞춰야 하는 방사성핵종과 경로 및 누출 메커니즘을 결정하기 위한 계산을 포함해야 한다. 추정 계산(Scoping calculation)은 종종 문헌조사, 제한된 데이터와 자재의 규격, 실험실 연구 및 자연유사물 연구, 부지에 대한 예비 조사, 폐기물 특성 조사와 같은 제한된 데이터에 근거한다. 처분시설이 영구적으로 폐쇄되거나 제안된 개념이 수용될 수 없다고 결정될 때까지 단계별 절차를 통하여 계속해서 데이터를 얻게 될 것이다.