문서

파일 다운로드
  • 부록2._IAEA_SSG-14.hwp

    659.5 KB

[4.3] a

4.3. The development of a geological disposal facility involves an iterative process of site characterization and the design and evolution of the safety case and the supporting safety assessment to provide an optimized level of operational and post-closure safety (see the appendix of Ref. [1]). Geological disposal facilities for radioactive waste may be developed and operated over a period of several years or several decades. Key decisions, such as decisions on the choice of concept, site selection and evaluation, design, construction, operation and closure of the disposal facility, are expected to be made as the project develops. In this process, decisions are made on the basis of information available at the time, which may be qualitative and/or quantitative, and on the confidence that can be placed in that information. Facility development, operation and closure decisions are influenced by external factors, such as national policy and preferences. "An adequate level of confidence in the safety of each disposal facility has to be developed before decisions are taken" [1].

[4.3] 개발과정에서의 안전의 중요성

4.3. 심층처분시설의 개발은 운영 중 및 폐쇄 후 최적화된 안전성을 제공하기 위해 부지특성조사와 Safety Case 및 이를 뒷받침하는 안전성 평가의 설계 및 진화의 반복적인 과정을 포함한다(참고문헌[1]의 부록 참조). 방사성폐기물 심층처분시설은 수년 또는 수십 년 이상의 기간 동안 개발되어 운영될 수 있다. 처분시설의 프로젝트가 개발됨에 따라 개념 선택, 부지선정 및 평가, 설계, 건설, 운영, 폐쇄와 같은 주요 의사결정이 이루어질 것으로 기대된다. 이러한 과정에서 해당 시점에 정량적이거나 정성적인 유효한 정보를 근거로, 또한 해당 정보의 신뢰 정도에 따라 의사결정이 이루어진다. 처분시설의 개발, 운영, 폐쇄에 대한 결정은 국가 정책과 선호도와 같은 외적인 요인에 영향을 받게 된다. “의사결정이 이루어지기 전에 각 처분시설의 안전성에 대한 적절한 신뢰수준이 개발되어야 한다[1].”