[2.5] a

2.5. After site selection, for any disposal programme, a number of activities, grouped in broad areas, should be undertaken, namely, detailed site characterization and confirmation, design of the geological disposal facility, construction of the disposal facility, operation of the disposal facility (i.e. receipt and emplacement of waste) and closure of the disposal facility. These activities may not occur sequentially and there may be overlap. The last three of these correspond to three important steps in the regulatory approval of a geological disposal facility (see Fig. 1). The inclusion of additional steps will largely be a matter of national preference. Site characterization and design activities may be expected to continue, at some level, up to facility closure.

[2.5] 심층처분의 개요 및 이행

2.5. 하나의 처분 프로그램에서 부지선정 이후 광범위한 영역으로 분류된 수많은 활동, 즉, 상세 부지특성조사, 부지확정, 설계, 건설, 운영(즉, 폐기물의 인수 및 정치), 폐쇄가 이루어진다. 이러한 활동이 순차적으로 발생하지 않고 중복될 수도 있다. 이 중 마지막 세 단계가 심층처분시설의 규제 승인에 있어 중요한 단계에 해당한다(그림 1 참조). 추가적인 단계의 포함 여부는 주로 국가별 선호의 문제가 될 것이다. 부지특성조사와 설계 활동은 처분시설이 폐쇄될 때까지 일부 수준으로 지속될 것으로 기대된다.
그림 1. 심층처분시설 개발 일정표